
3 September 2026
SWIP-North construction starts on a 285-mile 500-kV Idaho–Nevada line
A groundbreaking was held September 3 in Ely, Nevada.
The full briefing is in the app.

3 September 2026
A groundbreaking was held September 3 in Ely, Nevada.
The full briefing is in the app.