25 August 2026
Inertia and LLNL cut frozen D-T layer time to hours
Inertia said the process takes two to three hours within design tolerances, verified with LLNL ignition-design codes.
The full briefing is in the app.
25 August 2026
Inertia said the process takes two to three hours within design tolerances, verified with LLNL ignition-design codes.
The full briefing is in the app.