
3 August 2026
PJM files 6.8-GW backstop auction at FERC
The PJM Interconnection proposed a one-time reliability backstop auction from Sept. 30 to Oct. 21 to fill a 6.8-GW shortfall from its last base capacity auction.
The full briefing is in the app.