
28 August 2026
VIS says Taoyuan fire left Fab 3 little affected
The blaze covered about 20m² on the top floor of the four-story plant.
The full briefing is in the app.

28 August 2026
The blaze covered about 20m² on the top floor of the four-story plant.
The full briefing is in the app.